Day Five: Tuesday, October 7th On the Canal du Midi!
OK, we are all up early (07:30) as the lock is open at 09:00 and we want to be first in line. It is a beautiful sunny blue sky morning. About 9 degrees early on, but it will substantially warm during the day. In the boat waking up we need to find the heater! Lana figures out that it's a good idea to put her morning clothes in bed with us so they will be warm in the morning when she wakes up.
We are all pretty excited as this is our first day on the boat and we will be taking locks for the first time. We will be travelling downstream and mostly eastward. You could term this a "travel day". Early in our trip we decide to get as far as we can downstream before stopping for the night. We had no idea of the amount of physicality required to navigate each lock. It would be quite a day!
We decided to set our roles/duties for getting in, through and out each lock. On a good note, each of the locks had a lock keeper so we never had the manage the locks. Phew....Al will be our captain/skipper and task master. I will be jumping out of the boat prior to each lock and then getting the two ropes wrapped around the metal stanchions to hold the boat as the water recedes. Lana will be in the back of the boat and Pat at the front of the boat each with a rope and ensuring it is tight to their stanchion. Sounds easy? Nope! Plus, the ladies need to keep our boat as close to the lock wall as possible. Lana says throwing the ropes especially when wet is like trying to toss a large wet spaghetti noodles with little or no control as to where it goes even if you aim.
Also, on approaching each lock we need to moor to canal stanchions which will be me and my ability at tying a knot is zero. I get good lessons from Al and over the day I manage to learn a good knot which helps a great deal. A good skill anyway. Oh yeah, you do NOT tie the ropes to the stanchions inside of each lock as the boat needs to rise and/or fall with the water. When there is more than one lock then I need to get to the next lock entrance and be ready for each rope toss. Over the entire day I manage to record around 10,000 steps which gives you a heads up on how much progress we make today downstream. Lana bought us a new pair of water proof gloves so I had something to wear to protect my hands from handling all the wet ropes.
At the very first set of locks at Trèbes (about five minutes from where we moored at Le Boat) it is three locks in a row! Wow, we need to learn quickly and teamwork is super important. Also, on trying to exit the third lock the gate doesn't open which causes a ten minute delay as the lock keeper trouble shoots. My other role on the boat is the 'navigator' but not in terms of where to go, but recording our times for each lock and time period between locks as we will need this on our return trip. Pretty good map provided by Le Boat though.
Pretty cool to watch the locks water as it fills up and drops. Of course the last lock needs to always be even with the canal depth. Powerful onrush of water between the locks. Some of the locks have the capability/size to take up to four boats at one time. Obviously this slows down our progress when there is another boat in the lock.
OK, enough text so lets get to our pictures!
In the first set of locks!
Incredible boat statistics for today! We managed to get through 19 locks and 31 kms of distance on the canal! We stayed moored overnight at Argens Minervois. Very quiet here and almost total blackness.
Online picture of Argens Minervois.
Total steps = 11,240 which shows how busy we were today with the locks and travel. I think we are all pretty exhausted, but happy with our progress! We did get some walking in at this town as well so it was good for all of us to stretch our legs.















Comments
Post a Comment